All new commercial building structures regardless of size, require an approved permit by the Building Inspections Division.
The following is required prior to issuance of a New Commercial Building Permit:
Let's get started!
We are currently only accepting online and in-person applications.
The following construction documents are required. ▪ Site Plan and Plot Plan ▪ Floor Plan (existing and proposed) ▪ Foundation Plan, Soils Report (if required) ▪ Roof/Floor Framing Plans ▪ Structural and Construction Details, Cross Sections, Structural Calculations (if required) ▪ Plumbing, Mechanical, and Electrical Plans ▪ Title 24 Energy Calculations and Forms
Plans must correctly identify and comply with current codes. Provide a statement on the title sheet of the plans indicating the project shall comply with the: ▪ 2019 California Residential Code (CRC) ▪ 2019 California Mechanical Code (CMC) ▪ 2019 California Plumbing Code (CPC) ▪ 2019 California Electrical Code (CEC) ▪ 2019 California Energy Code ▪ 2019 California Green Building Standards Code (CGBS) ▪ 2019 California Fire Code ▪ City of Augustus Municipal Code
The construction plans must be legible and shall be drawn on 24" x 36" paper. Typically, plan scale is 1/8” for the Site Plan & Plot Plan, and 1/4” scale for the Floor Plan, elevations, sections, details, etc. For a residential addition, submit four (3) complete sets of plans and two (2) sets of other construction documents, such as Structural Calculations and Soils Report, if required.
Plan review is required for this type of project.
You can perform an initial assessment of your residential construction project to validate that specific regulations are met. This will streamline the plan review process
Call us 707-555-0880 with any questions or email us. Plan reviewers are available 8:30 am until 4 pm, Monday through Friday.
This application will take 5 minutes once you've gathered the required information identified below. You can save you application and resume later if you need more time.
Be prepared to pay fees associated with your permit. We accept all major credit cards and echeck.
Once your completed application is received with proper filing order together with the correct filing fee, the review turn around time is 5 days.
Let's get started
Yes. After building permits are issued and construction has begun, the contractor or owner/builder is required to schedule building inspections through all phases of the construction project. This is to insure code compliance and good workmanship.